On April 18, 2013 this is what was said at the Charlottle County Airport Authority Meeting. More will be posted by the Airport Authority on there web site soon about the bid
(1) On May 14 or 15 - first walk-through to bid on the racetrack property. (
(2) On June 14 or 15 - second walk-through to bid.
(3) On or about July 25, bids must be turned in.
(4) On or about August 25, bid winner will be announced.
5) Winning bidder has up to 9 months, or after the first race is completed, to start paying the lease payments.
(6) In conclusion, this means the speedway will be closed a minimum of 6 months if it only takes one month after the bid is announced to get it race ready. Or a maximum of 14 months if the winning bidder drags his or her feet. As to the race enthusiasts, this may seem too long to be without a race. It is up the Airport Authority to get the best bid.
(7) I support the Board's efforts and with a lot of thinking on this matter I have decided to do the walk through with some other invester and make a bid on the track in July.
Gary Laplant
(1) On May 14 or 15 - first walk-through to bid on the racetrack property. (
(2) On June 14 or 15 - second walk-through to bid.
(3) On or about July 25, bids must be turned in.
(4) On or about August 25, bid winner will be announced.
5) Winning bidder has up to 9 months, or after the first race is completed, to start paying the lease payments.
(6) In conclusion, this means the speedway will be closed a minimum of 6 months if it only takes one month after the bid is announced to get it race ready. Or a maximum of 14 months if the winning bidder drags his or her feet. As to the race enthusiasts, this may seem too long to be without a race. It is up the Airport Authority to get the best bid.
(7) I support the Board's efforts and with a lot of thinking on this matter I have decided to do the walk through with some other invester and make a bid on the track in July.
Gary Laplant